Memorandum to the Vice President for Financial Affairs outlining the beginning balance of the equipment fund for the Library Phase II project ($141,439), the amount already spent ($138,950.08) and the balance remaining ($2,488.92)

Document…

A foam poster board illustrating the third floor plan of the proposed library expansion.

A foam poster board illustrating the second floor plan of the proposed library expansion.

A foam poster board illustrating the first floor plan of the proposed library expansion.

A foam poster board with three exterior illustrations of the proposed library expansion, representing the east elevation, south elevation, and north elevation.

1-Announcement of Committee Members.
2-Assumptions for Library Committee.
3-Description of Consulting Firm.
4-Consultant Resume.
5-Resources.

2 copies

I-Data.
II-Minutes.
III-Focus Group Comments.
IV-Current Issues and Trends in Libraries.

2 copies

Letter confirms phone conversation regarding specifications that must be adhered to by all bidders to receive consideration as responsive bidders for the library's shelving requirements.

Letter outlines reasons for delay in accepting the bid from Thalhimers Business Interiors on the Harvard #F13921 side chair; delay was due, in part, to the desired fabric covering being unavailable and the low quality of the substituted fabric. …

Letter also outlines reasons for rejecting bids from:
- Hart School Equipment - Krueger 1000G-STAP
- Krueger Metal Products - Krueger #6000G-UWF-TAP
- Modern School Equipment - Howell CS214
- Krueger Metal Products - Krueger…