Browse Items (11902 total)

W.M. Jordan Construction Company was awarded the contract to build a residence hall.
Traffic will enter campus via Warwick Boulevard entrance.…

Progress on Pomoco Stadium Construction

2 Copies

Floor plan of the first and second floor of Christopher Newport Hall.

2 copies

Chart of buildings and their costs

2 Copies

Contents:
- Floor Plan of the Library
- Location and Holdings
- Library Regulations
- The Card Catalog
- Sample Catalog Cards
- The Call…

Brochure lists faculty/staff of the science department, A Shorty History of the Building, and the layout of the building.

Map and legend of Christopher Newport University,

Attachment:
Photocopy of the photograph

Event features CNU faculty and students reading passages from books that have been challenged and/or banned from schools and libraries

Date: …

Report on the master site plan.

Contents:
I. Introduction
II. The Site
III. Campus zoning
IV. Development, 1964-1970
V. Ultimate…