- Scope
- General
- Material
- Finish
- Shelving Schedule
- General Specifications for Wood End Panels and Plastic End Panels

Copy…

Memo from Mary Sellen to President Trible
Introduction
Present Collection
Goals
Strategies
Programming Report (November 2001)
Appendix A…

Contents
1. Executive Summary
2. Program
3. System Narratives
4. Project Schedule
5. Conceptual Drawings
6. Total Project Budget
Appendix

Memorandum to the Vice President for Financial Affairs outlining the beginning balance of the equipment fund for the Library Phase II project…

PhaseII,ThirdFloorPlan.jpg
A foam poster board illustrating the third floor plan of the proposed library expansion.

PhaseII,SecondFloorPlan.jpg
A foam poster board illustrating the second floor plan of the proposed library expansion.

PhaseII,FirstFloorPlan.jpg
A foam poster board illustrating the first floor plan of the proposed library expansion.

PhaseII,Exterior.jpg
A foam poster board with three exterior illustrations of the proposed library expansion, representing the east elevation, south elevation, and north…

1-Announcement of Committee Members.
2-Assumptions for Library Committee.
3-Description of Consulting Firm.
4-Consultant…