Browse Items (11652 total)

Memorandum to Corky Greene, Director of Logistics, listing the following vendors who have given estimates for plant containers:

Anderson's Greenhouses
Tidewater Nurseries, Inc.
MacDonald Garden Center

Memo outlines certain specifications of shelving bid requirements:
- Delivery requirements
- Installation requirements
- Thickness of paint

Handwritten note indicates only one bidder (Watson) has thus far met the requirement of visiting the…

Memo to Jean Barger, Acquisitions Accountant, specifying CNC annual fund donation to be used in the library discretionary fund.

This item is located in the box titled, "Captain John Smith Library, Phase II, Furniture"
2 copies

Memorandum to the Vice President for Financial Affairs outlining the beginning balance of the equipment fund for the Library Phase II project ($141,439), the amount already spent ($138,950.08), and the balance remaining ($2,488.92)

This item is…

Rough draft memo to Bette Mosteller, Library Director, outlining the audio listening system and the television viewing system components and prices, as well as the other requested audio visual equipment listed in order of priority.

Memorandum to Jean Barger, Acquisitions Accountant, requesting that $50 be placed in the library's drapery fund, be transferred to the discretionary fund, along with $60 already donated, and be used for the purchase of two large plants for the…

Memorandum to James D. Eagle, Vice President for Financial Affairs, attaching copies of memoranda from Public Service library staff members verifying the noise problem that exists between the Library Director's office and the Reference Room, and…

Memo encloses Harvard fabrics for consideration along with Gunlocke fabrics.

This item located in box titled, "Captain John Smith Library, Phase II, Furniture"

Letter from Jane E. Holliday of Thalhimers Business Interiors, Inc., enclosing fabric samples.

This item located in box titled, "Captain John Smith Library, Phase II, Furniture"

Memorandum to Bette Mosteller, Library Director, confirming that the carpeting project has been completed and is approved. Although it was preferred that the carpet around the railing be installed differently, the vendor was not willing to change…
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2