Memorandum to the Vice President for Financial Affairs outlining the beginning balance of the equipment fund for the Library Phase II project ($141,439), the amount already spent ($138,950.08) and the balance remaining ($2,488.92)

Document…

Contents
1. Executive Summary
2. Program
3. System Narratives
4. Project Schedule
5. Conceptual Drawings
6. Total Project Budget
Appendix

Memo from Mary Sellen to President Trible
Introduction
Present Collection
Goals
Strategies
Programming Report (November 2001)
Appendix A VIVA
Appendix B Projected Costs of Goal One
Appendix C Databases with citations to Books
Appendix D…

Contents:
- Scope
- General
- Material
- Finish
- Shelving Schedule
- General Specifications for Wood End Panels and Plastic End Panels

Copy contains handwritten notes in pencil

This item located in box titled, "Captain John Smith…

Fabrics list includes:
- Corfu
- Java
- Columbo 1
- Columbo 2
- Columbo 2, Random Stripe
- Checkmate

2 copies

Handwritten note attached includes:
- Java
- Chateau
- Checkmate

This item located in box titled, "Captain John Smith…

Memo outlines certain specifications of shelving bid requirements:
- Delivery requirements
- Installation requirements
- Thickness of paint

Handwritten note indicates only one bidder (Watson) has thus far met the requirement of visiting the…

Letter from Jane E. Holliday of Thalhimers Business Interiors, Inc., enclosing fabric samples.

This item located in box titled, "Captain John Smith Library, Phase II, Furniture"

Memo encloses Harvard fabrics for consideration along with Gunlocke fabrics.

This item located in box titled, "Captain John Smith Library, Phase II, Furniture"

Measurements for the following windows:
- Upstairs reserve area (back of building - 14 windows)
- Upstairs reserve area (in front of reserve desk - 6 windows)
- Downstairs viewing room - 2 windows
- Downstairs meeting room - 4 windows

2 copies