2.9 D Building Plans & Related Expansion Information
Dublin Core
Title
2.9 D Building Plans & Related Expansion Information
Collection Items
2.9 D A/E Design Services for Library Addition/Renovation Student Center Building, Gosnold Hall Renovation
Architectural/Engineering Firm Data Relevant Project Experience
2.9 D Library and Information Technology Center (November 2001)
1. Executive Summary
2. Introduction and Process
3. Philosophy and Mission
4. Program, Adjacency, Projected Needs
5. Scenarios for the Library of the 21st Century
6. Peer Models
7. Next Steps and Opportunities Appendix.
2 copies
PDF…
2. Introduction and Process
3. Philosophy and Mission
4. Program, Adjacency, Projected Needs
5. Scenarios for the Library of the 21st Century
6. Peer Models
7. Next Steps and Opportunities Appendix.
2 copies
PDF…
2.9 D Preliminary Design Narrative Library and Information Technology Center (August 2003)
Introduction
Architectural Description
Building System Description
Appendix
Architectural Description
Building System Description
Appendix
2.9 D Specifications Additions to Captain John Smith Library Christopher Newport College Newport News, Virginia
Invitation to Bid
Instructions to Bidders
Bid Form
Certification
General Conditions of the Contract for Capital Outlay Projects
Supplemental General Conditions
Form of Agreement
Standard Performance Bond
Standard Labor and Material…
Instructions to Bidders
Bid Form
Certification
General Conditions of the Contract for Capital Outlay Projects
Supplemental General Conditions
Form of Agreement
Standard Performance Bond
Standard Labor and Material…
2.9 D Preliminary Submittal for Christopher Newport College for Library Addition Phase III
1 - Basis of Design Narrative
2 - Building Systems and Equipment Checklist
3 - Project Cost Estimate
4 - Soils Report
5 - Preliminary Drawings
2 - Building Systems and Equipment Checklist
3 - Project Cost Estimate
4 - Soils Report
5 - Preliminary Drawings
2.9 D Specifications for Construction of Alterations and Additions to Captain John Smith Library Christopher Newport College Newport News, Virginia
Contract Requirements
Division 1 - General Requirements
Division 2 - Site Work
Division 3 - Concrete
Division 4 - Masonry
Division 5 - Metals
Division 6 - Wood and Plastics
Division 7 - Thermal and Moisture Protection
Division 8 -…
Division 1 - General Requirements
Division 2 - Site Work
Division 3 - Concrete
Division 4 - Masonry
Division 5 - Metals
Division 6 - Wood and Plastics
Division 7 - Thermal and Moisture Protection
Division 8 -…
2.9 D Pre-Smith Library Planning Folder
Contains:
-Four sets of handwritten notes
-Outline of recommendations for projected Circulation and Reference areas, CNC library
-Suggestions for the New Library
-Memo: Library Design
-Recommendations for CNC library/Observations at other…
-Four sets of handwritten notes
-Outline of recommendations for projected Circulation and Reference areas, CNC library
-Suggestions for the New Library
-Memo: Library Design
-Recommendations for CNC library/Observations at other…
2,9 D Captain John Smith Library Phase I Box
Contains folders titled:
-Phase I Specifications
-Phase I Correspondence, Purchase Orders
-Phase I Drawings/Schematics
-Phase I Specifications
-Phase I Correspondence, Purchase Orders
-Phase I Drawings/Schematics
2.9D Captain John Smith Library Phase II Box
Folders titled:
-Phase II Correspondence (undated)
-Phase II Correspondence (1972-78)
-Phase II Correspondence (1979)
-Phase II Correspondence (1980-82)
-Phase II Purchase Orders
-Preliminary Plans-Phase II (1970-72)
-Preliminary Plans-Phase…
-Phase II Correspondence (undated)
-Phase II Correspondence (1972-78)
-Phase II Correspondence (1979)
-Phase II Correspondence (1980-82)
-Phase II Purchase Orders
-Preliminary Plans-Phase II (1970-72)
-Preliminary Plans-Phase…
2.9 D 1988-90 Biennium Preplanning Study for Christopher Newport College For Library Addition, Phase III
1-Capital Project Request Summary Forms.
2-Project Justification (from Capital Budget Proposal).
3-Project Criteria.
4-Project Description.
5-Project Costs.
6-Schedule for Completing the Project.
7-Supporting Material.
2-Project Justification (from Capital Budget Proposal).
3-Project Criteria.
4-Project Description.
5-Project Costs.
6-Schedule for Completing the Project.
7-Supporting Material.